Product | Customized Printing Laminated PP Woven Block Bottom Valve Sack With Self Closing Inner Valve |
Material | PP woven Laminated |
Printing | Max 4 colors in each side; Muti-color Printing |
GSM | 60gsm+20gsm;60gsm+15gsm; |
Air Permeability | 80-120 Nm/hr or As per customer’s requirements |
Application | Cement, putty, gypsum, carbon powder, fertilizer, powdered and granular goods,plastic resins and construction material, etc |
Packaging | 6000-10000pcs/pallet,or as customers’ requirements |
ProductionCapability |
60000000 bags/Month |
Delivery Time | The first container within 30 days after order confirmation , the later as per customer’s requirements |
Payment Terms |
T/T 30% in advance, T/T the balance before delivery |
Q1:Are you the factory or trading company?
A:Our factory was founded in 2005.We are family business, and our boss have more than 34 years producing experience. We supply cement bag for China Resources for 10 years, which is one of largest cement company in China.
Our factory comprise of :
Two Starlinger auto bag making machines(Starlinger Ad Star*Kon AX+)
Two Highspeed Tapelines
One Hundred and Fifty-Six Loom machines
Three Lamination machines
Seven Printing machines
Q2:What kinds of product can you provide?
A:Our main products are block bottom valve bags and Ordinary PP woven bag. We are professional manufacturer for cement bag, building material bag and chemical material bag. Especially for block bottom valve bags, our company has introduced two latest automatic bag making machines from Austria Starlinger company.
Q3:How can I get a quote?
A:You can contact me on the bottom of this page, and we need to know size, material, quantity, gram weight, printing, closure and other requirements you prefer to figure out an exact quote.
Q4:Are you willing to provide the samples?
We are happy to provide the samples to you. If sample is in stock, free sample and free express fee.
Q5:what is the payment term and delivery time?
Usually the payment term is: T/T 30% in advance, T/T the balance Before Delivery.
the delivery time is: within 25-30days for one 20ft container or 40HQ container for first time delivery.